Clean, Green & Resilient

A plain-language explainer · 8th-grade reading level · every figure below is sourced and checkable.

What’s wrong here

This category covers a lot: clean streets, garbage, parks, snow clearing, old buildings, accessible sidewalks, flooding, and greener buildings. Three threads have the clearest numbers.

Start with garbage. Toronto’s only landfill, Green Lane, is expected to be full by 2034 or 2035.1 About 30% of Ontario’s waste already gets shipped across the border to the US.2 Toronto recycled or composted 50.6% of household waste in 2025, but that hides a big gap: houses hit 60.3%, while apartment towers managed only 26.3%. No source explains why.3

Snow is a similar story of good plans, unevenly kept. The city spends $143.8 million a year clearing 14,700 lane-km of roads and 7,900 km of sidewalks.4 In February 2025, a major storm overwhelmed sidewalks and local streets even though main roads stayed clear; residents filed more than 25,000 winter-related 311 complaints, and cleanup cost about $20 million.5 That storm hit after years of the city’s own Auditor General flagging contract oversight gaps — as of a 2025 check, 9 of 30 recommendations from earlier audits still were not fully in place.6

Flooding is the third thread, and the most expensive one. A single storm in July 2024 caused roughly $899 million to $940 million in insured damage and flooded more than 1,000 basements — Toronto’s third “hundred-year storm” in a decade.7 Ontario’s own Auditor General found only 28% of municipalities with stormwater costs in 2020 collected any dedicated revenue to pay for it.8 Toronto considered a dedicated stormwater fee for over a decade, then Council directed staff to indefinitely suspend it.9

What’s been proven to work elsewhere

Seoul weighs household food waste electronically and, since December 2025, pays residents credit for cutting what they throw out by 10% or more.10

Ottawa built a $232-million storage tunnel that has already cut sewage overflows and reduced flood risk for about 7,000 homes.11 Toronto’s own comparable tunnel is still under construction and not due to finish until 2034.

What we could choose together

Most of this category is squarely the City of Toronto’s own job: garbage collection, parks, snow clearing, and street cleanliness are all direct municipal responsibilities under the Municipal Act. The city can fund a stronger winter-storm response on its own: its own consultants priced a fix at $24.0 million a season, which “can primarily be accommodated within the City’s current winter maintenance budget.”12 It can also revive a scoped stormwater fee for commercial and industrial properties, a version it already studied once before shelving the whole idea.13

Some of this needs the Province of Ontario. Flood-plain mapping and river flood control belong to provincial conservation authorities, not the city.14 The province also sets the Building Code standard for backwater valves that help prevent basement flooding — its own survey of 52 chief building officials found only 27% required them in all new homes, even though a valve costs about $250 to install versus roughly $43,000 to fix a flooded basement afterward.15 Accessible public spaces are governed by provincial accessibility law the city implements locally, and building-retrofit standards trace back to the same provincial Building Code.

The federal government mostly shows up through infrastructure funding and national flood insurance discussions, and rules affecting where garbage can go once landfills run out.

This category also includes heritage building protection and disabled residents’ access to sidewalks — real issues where the sources reviewed did not turn up figures strong enough to cite honestly here. That is a gap in this draft, not a judgment that those issues matter less.

One question to ask any candidate: “Toronto’s landfill is projected to be full by 2034 or 2035, and only 26.3% of apartment-tower waste gets diverted from it, compared to 60.3% for houses. What will you do to close that gap, and how can I check the diversion rate for my own building?”

Sources & receipts

  1. Green Lane Landfill projected to reach capacity by 2034/2035 — City of Toronto news release, June 2023.
  2. About 30% of Ontario’s waste is exported to the United States — Global News, citing a 2021 Ontario Waste Management Association study and a City staff report.
  3. Toronto’s 2025 waste diversion: 50.6% combined, 60.3% for single-family homes, 26.3% for multi-residential buildings — City of Toronto solid waste management figures.
  4. Toronto’s winter maintenance budget is $143.8 million a year, covering 14,700 lane-km of roads and 7,900 km of sidewalks — 2025 municipal winter-operations consultant report.
  5. February 2025 storm: more than 25,000 winter-related 311 requests and about $20 million in cleanup costs — 2025 municipal winter-operations consultant report.
  6. As of a 2025 follow-up, 9 of 30 cumulative Auditor General recommendations on winter maintenance were still not fully implemented ahead of the February 2025 storm — Toronto Auditor General, 2025 Annual Report.
  7. July 2024 storm caused about $899 million to $940 million in insured damage and flooded more than 1,000 basements, Toronto’s third hundred-year storm in a decade — Insurance Bureau of Canada; CatIQ.
  8. Only 28% of Ontario municipalities with stormwater costs in 2020 collected dedicated revenue for them — Auditor General of Ontario, 2022.
  9. Toronto City Council directed staff to indefinitely suspend consideration of a dedicated stormwater charge — City of Toronto public consultation records.
  10. Seoul’s electronic food-waste weighing system has, since December 2025, paid residents credit for cutting food waste by 10% or more — Korea Herald, December 2025.
  11. Ottawa’s $232-million storage tunnel has reduced sewage overflows and cut flood risk for about 7,000 properties — Ottawa Urban Flood Information Report, 2024.
  12. The city’s 2025 consultant-recommended winter-storm fix costs $24.0 million a season and can largely be accommodated within the existing winter maintenance budget — 2025 municipal winter-operations consultant report.
  13. A scoped commercial/industrial stormwater charge was studied in 2020–2021 before the broader stormwater-fee idea was suspended — City of Toronto records.
  14. River flood-plain mapping and flood control are handled by provincial conservation authorities, not the city — City of Toronto and provincial jurisdiction records.
  15. Only 27% of 52 surveyed Ontario chief building officials required backwater valves in all new homes, even though a valve costs about $250 versus roughly $43,000 to repair a flooded basement — Auditor General of Ontario, 2022.

This explainer went through an independent verification pass before publication (fact-check against primary sources, claim by claim). The internal verification record has been removed from this public page; the sourced facts and figures above are unchanged by that removal.