National Museum of Science and Technology
likely = Ingenium/Canada Science and Technology Museums Corp, verify overlap; newsroom URL (media centre) and Ingenium's own corporate-documents page not directly re-fetched to confirm; operates as Ingenium (Crown corp, formerly National Museum of Science and Technology); FOI via central open.canada.ca portal
Current this library's internal records: Corporate plan summary: 2026-2027 to 2030-2031 (2027)
Completeness
- Document shelf: 41 rows (41 archived · 0 staged · 0 pending · 0 missing)
- Backgrounder: on file
- Strategy-evolution brief: on file
- Custody audit: 33 of 41 row(s) audited, 7 flagged
- Last verified: 2026-08-06 · this org has had a full discovery-verification pass (our discovery-verification log)
Endpoints
- Website
- Open data: not yet verified
- API: not yet verified
- RSS: not yet verified
- Newsroom
- FOI / access requests
Document shelf (41 rows)
| Year | Type | Title | Archive status | Flags |
|---|---|---|---|---|
| 2031 | Business / corporate plan | Ingenium Corporate Plan Summary 2026-2027 to 2030-2031 | archived | |
| 2030 | Business / corporate plan | Ingenium Corporate Plan Summary 2025-26 | archived | |
| 2029 | Business / corporate plan | Ingenium Corporate Plan Summary 2024-25 | archived | |
| 2028 | Business / corporate plan | Ingenium Corporate Plan Summary 2023-2024 to 2027-2028 | archived | |
| 2027 | Business / corporate plan | Ingenium Corporate Plan Summary 2022-2023 to 2026-2027 | archived | |
| 2026 | Business / corporate plan | Ingenium Corporate Plan Summary 2021-2022 to 2025-2026 | archived | |
| 2025 | Annual report | Ingenium Annual Report 24-25 | archived | |
| 2025 | Business / corporate plan | Ingenium Corporate Plan Summary 2020-2021 to 2024-2025 | archived | |
| 2024 | Annual report | Ingenium Annual Report 2023-24 | archived | |
| 2024 | Business / corporate plan | Ingenium Corporate Plan Summary 2019-2020 to 2023-2024 | archived | new-row 2026-08-06: GOV-ATLAS-COMPLETENESS-SWEEP-d1 batch 1, P9-grounded this review |
| 2023 | Annual report | Ingenium Annual Report 2022-2023 | archived | |
| 2023 | Business / corporate plan | Ingenium Corporate Plan Summary 2018-2019 to 2022-2023 | archived | new-row 2026-08-06: GOV-ATLAS-COMPLETENESS-SWEEP-d1 batch 1, P9-grounded this review |
| 2022 | Annual report | Ingenium Annual Report 2021-2022 | archived | |
| 2022 | Business / corporate plan | Ingenium Corporate Plan Summary 2017-2018 to 2021-2022 | archived | new-row 2026-08-06: GOV-ATLAS-COMPLETENESS-SWEEP-d1 batch 1, P9-grounded this review |
| 2021 | Annual report | Ingenium Annual Report 2020-2021 | archived | |
| 2021 | Business / corporate plan | Ingenium Corporate Plan Summary 2016-2017 to 2020-2021 | archived | new-row 2026-08-06: GOV-ATLAS-COMPLETENESS-SWEEP-d1 batch 1, P9-grounded this review |
| 2020 | Annual report | Ingenium Annual Report 2019-2020 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2020 | Business / corporate plan | Ingenium Corporate Plan Summary 2015-2016 to 2019-2020 | archived | new-row 2026-08-06: GOV-ATLAS-COMPLETENESS-SWEEP-d1 batch 1, P9-grounded this review |
| 2019 | Annual report | Ingenium Annual Report 2018-2019 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2019 | Business / corporate plan | Ingenium Corporate Plan Summary 2014-2015 to 2018-2019 | archived | new-row 2026-08-06: GOV-ATLAS-COMPLETENESS-SWEEP-d1 batch 1, P9-grounded this review |
| 2018 | Annual report | Ingenium Annual Report 2017-2018 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2018 | Business / corporate plan | Ingenium/CSTMC Summary of the Corporate Plan 2013-2014 to 2017-2018 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2017 | Annual report | Annual Report 2016-2017 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2016 | Annual report | Annual Report 2015-2016 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2015 | Annual report | Annual Report 2014-2015 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2015 | Business / corporate plan | Ingenium/CSTMC Summary of the Corporate Plan 2010-2011 to 2014-2015 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2014 | Annual report | Annual Report 2013-2014 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2013 | Annual report | Annual Report 2012-2013 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2012 | Annual report | Annual Report 2011-2012 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2011 | Annual report | Annual Report 2010-2011 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2010 | Annual report | Annual Report 2009-2010 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2009 | Annual report | Annual Report 2008-2009 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2008 | Annual report | Annual Report 2007-2008 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2007 | Annual report | Annual Report 06/07 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2006 | Annual report | Annual Report 2005-2006 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2005 | Annual report | Annual Report 2004-05 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2004 | Annual report | Annual Report 2003-2004 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2003 | Annual report | Annual Report 2002-2003 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2002 | Annual report | Annual Report 2001-2002 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2001 | Annual report | Annual Report 2000-2001 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
| 2000 | Annual report | National Museum of Science and Technology Annual Report 1999-2000 | archived | ⚠️ Still being checked: capture-artifact-goc-interstitial |
Backgrounder
Source: this library's internal records — a mechanical research draft, not independently reviewed for publication; reproduced as-is.
National Museum of Science and Technology - backgrounder
Backgrounder / GOV-Q10-WAVE1-d1 / 2026-08-04 / registry row: fed-national-museum-science-technology (this library's government-document registry) / lens file for this org's series briefs
Mandate & statutory basis
"The National Museum of Science and Technology (the Corporation) was established by the Museums Act on July 1, 1990, and is a Crown corporation named in Part I of Schedule III to the Financial Administration Act" (Ingenium Annual Report 24-25, Note 1 "Authority, mandate and operations", https://ingenium.ca/wp-content/uploads/2025/10/Ingenium-Annual-report-24-25_FINAL.pdf, fetched this review). Per the Museums Act, its mandate is "to foster scientific and technological literacy throughout Canada by establishing, maintaining and developing a collection of scientific and technical objects...and by demonstrating the products and processes of science and technology and their economic, social, and cultural relationships with society" (same source).
Roles, responsibilities & scope
The Corporation operates publicly under the trade name "Ingenium - Canada's Museums of Science and Innovation" and manages three national museum sites: the Canada Science and Technology Museum, the Canada Aviation and Space Museum, and the Canada Agriculture and Food Museum (same source).
Governance & reporting line
Ingenium "is a Crown corporation governed by a Board of Trustees, who are appointed by the Governor in Council on the recommendation of the Minister of Canadian Identity and Culture and Minister responsible for Official Languages" and "is accountable to Parliament, through [that Minister], for Ingenium's business affairs" (same source). The Board has up to 11 trustees and operates subject to Part X of the Financial Administration Act; its financial statements are audited by the Auditor General of Canada, who "reports to the Minister responsible for the Corporation" (same source).
Budget scale
Parliamentary appropriations recognized on an accrual basis rose from $47.5 million in 2023-24 to $49.1 million in 2024-25; total revenues were $14.4 million (up from $13.3 million) and total expenses were $64.3 million (up from $58.5 million), an increase driven by capital projects and new exhibitions (Ingenium Annual Report 24-25, "Sources of funds"/"Expenditures" sections, same URL).
Institutional history
Established July 1, 1990 under the Museums Act as the National Museum of Science and Technology, the Corporation now operates publicly as Ingenium (same source, Note 1).
Strategy evolution brief
Source: this library's internal records — a mechanical research draft, not independently reviewed for publication; reproduced as-is.
National Museum of Science and Technology - strategy evolution
2026-08-02 / registry: fed-national-museum-science-technology / grounded in archived copies (cited document id + sha256) / read through our research file for that body
TL;DR: The biggest priority addition is the Ingenium Centre, a $150.6-million purpose-built collections storage and research facility (base construction alone) built 2016-2020, which absorbed the bulk of the corporation's capital budget for half a decade and is credited with a Gold-Level Rick Hansen Foundation accessibility certification. The biggest quietly dropped element is not a program but a financial cushion: the corporation's unrestricted net assets, positive every year through 2025-26 (forecast $8.1 million), are projected to turn negative by 2027-28 (-$7.2 million) and keep falling to -$51.0 million by 2030-31 as temporary federal top-up funding is assumed to lapse after 2026-27 — a structural deficit the corporation itself frames as deliberate ("was not subject to reductions from the Comprehensive Expenditure Review" but "continues to exercise fiscal restraint"). The most load-bearing number specific to this org's own flagship site, the Canada Science and Technology Museum (CSTM): attendance of 367,000 in 2019-20 collapsed to 279,000 by 2022-23 and is budgeted flat at 325,000 through 2026-27 — a recovery that stalls below the pre-pandemic baseline even as the corporation's other two sites (CASM, CAFM) receive comparatively larger shares of the 2024-2031 capital plan. One open question the record cannot resolve: what becomes of the corporation's Sustainability and Outreach Committee, established August 2020 and dissolved by the Board in September 2025 with no stated reason in either document read.
Backgrounder summary
The National Museum of Science and Technology was established by the Museums Act on July 1, 1990, and is a Crown corporation named in Part I of Schedule III to the Financial Administration Act, mandated "to foster scientific and technological literacy throughout Canada by establishing, maintaining and developing a collection of scientific and technical objects... and by demonstrating the products and processes of science and technology and their economic, social, and cultural relationships with society." It operates publicly under the trade name "Ingenium — Canada's Museums of Science and Innovation" and manages three national museum sites: the Canada Science and Technology Museum (CSTM), the Canada Aviation and Space Museum (CASM), and the Canada Agriculture and Food Museum (CAFM). It is governed by a Board of Trustees (up to 11 members, Governor-in-Council appointees on the recommendation of the Minister of Canadian Identity and Culture and Minister responsible for Official Languages), operates under Part X of the Financial Administration Act, and is audited by the Auditor General of Canada. Parliamentary appropriations recognized on an accrual basis rose from $47.5 million (2023-24) to $49.1 million (2024-25); total revenues $14.4 million and total expenses $64.3 million in 2024-25, an increase driven by capital projects and new exhibitions.
Series inventory
_index.json: 12 ok / 21 no-manifest-match (0 stub-suspected, 0 extract-failed).
Registry (our document registry) carries 33 rows for this org spanning 2000-2031; all 33 are marked archived in the registry's own archive_status field, but 21 of those (all annual reports, 2000-2020) resolved to no-manifest-match — no matching WARC capture exists in this extraction for that entire span. 21 of the 33 rows carry a ⚠️ Still being checked: capture-artifact-goc-interstitial flag. This is the largest proportional archive gap of this lane's four orgs: two full decades of annual reporting (2000-2020) are unavailable, and the readable record begins only with the corporation's pandemic-year report.
Shared-document flag: this org's two most recent documents are the identical underlying files as a sibling org's brief. fed-national-museum-science-technology-ar-2025 (sha f282fa612d43) is the same PDF cited in fed-canada-agriculture-food-museum_STRATEGY_EVOLUTION.md as that org's ar-2025, and fed-national-museum-science-technology-bp-2031 (sha 2ec815d9d4f8) is the same PDF cited there as bp-2027. Both documents are Ingenium-corporation-wide publications (annual report and rolling five-year corporate plan) covering all three sites; they are registered against two different site-level org_ids in this atlas because Ingenium publishes one report per year, not one per site. This org (fed-national-museum-science-technology, the legal Crown corporation itself, styled Ingenium) is the natural, non-derivative home for these documents — unlike the CAFM registration, which borrows a corporate-wide document for a single-site brief. This brief cites CSTM- and corporation-wide content directly from these documents; where a figure is corporation-wide rather than CSTM-specific, it is labeled as such.
| document id | year | type | archive ref sha256-12 | content read? |
|---|---|---|---|---|
| fed-national-museum-science-technology-ar-2000 through -ar-2020 (21 rows) | 2000-2020 | annual-report | — | not captured (no-manifest-match; registry marks archived but no matching WARC capture exists in this extraction) |
| fed-national-museum-science-technology-ar-2021 | 2021 | annual-report | 9a64032c1a0a | yes |
| fed-national-museum-science-technology-ar-2022 | 2022 | annual-report | 31dc0df1a60e | skipped (not opened; keyword-scanned only — see Residuals) |
| fed-national-museum-science-technology-ar-2023 | 2023 | annual-report | 655a3cab7a14 | skipped (not opened; keyword-scanned only — see Residuals) |
| fed-national-museum-science-technology-ar-2024 | 2024 | annual-report | 627db0ecea7e | skipped (not opened; keyword-scanned only — see Residuals) |
| fed-national-museum-science-technology-ar-2025 | 2025 | annual-report | f282fa612d43 | sampled (governance/committee and CEO/Chair continuity passages read directly from this org's copy; broader corporate-wide content cross-referenced against the CAFM sibling brief's fuller read of the same document — see Residuals) |
| fed-national-museum-science-technology-bp-2025 | 2025 | business-plan | af0205ee75ce | yes (Corporate Plan Summary 2020-2021 to 2024-2025 — read for museum descriptions, Ingenium Centre capital table, and CSTM 2017 reopening) |
| fed-national-museum-science-technology-bp-2026 | 2026 | business-plan | 4228ee67a636 | skipped (not opened; see Residuals) |
| fed-national-museum-science-technology-bp-2027 | 2027 | business-plan | 854712daa22c | skipped (not opened; see Residuals) |
| fed-national-museum-science-technology-bp-2028 | 2028 | business-plan | 44d6acc7ef36 | skipped (not opened; see Residuals) |
| fed-national-museum-science-technology-bp-2029 | 2029 | business-plan | d1b9ea988887 | skipped (not opened; see Residuals) |
| fed-national-museum-science-technology-bp-2030 | 2030 | business-plan | 6408d34726ae | skipped (not opened; see Residuals) |
| fed-national-museum-science-technology-bp-2031 | 2031 | business-plan | 2ec815d9d4f8 | yes (Corporate Plan Summary 2026-2027 to 2030-2031 — read directly for CSTM-specific capital and attendance tables and the corporation-wide deficit trajectory) |
Full-form applied, with the large capture gap named prominently as instructed. 12 documents carry real content — 5 annual reports (2021-2025, but only 2021 read in depth; 2022-2024 not opened) and 7 rolling corporate-plan summaries (2025-2031, but only the oldest, bp-2025, and newest, bp-2031, read in depth). This comfortably clears the ≥3-usable-document full-form threshold, but the usable window is entirely post-2020 — two full decades of the corporation's own reported history (2000-2020, spanning its founding-era mandate, its operation before the CSTM's 2014-2017 renewal closure, and the closure/reopening itself) are absent from this archive and cannot be analyzed. Documents read in depth: ar-2021 (oldest usable, full — pandemic-year message, governance, and MD&A sections), bp-2025 (oldest corporate plan, full — museum descriptions, Ingenium Centre capital-cost table), bp-2031 (newest corporate plan, targeted — CSTM-specific capital and attendance tables, corporation-wide deficit trajectory), ar-2025 (newest annual report, targeted — governance/leadership-continuity check). Three annual reports (ar-2022, ar-2023, ar-2024) were keyword-screened but not opened. Five corporate plans (bp-2026 through bp-2030) were not opened at all.
Priority evolution
2020-21 (ar-2021, 9a64032c1a0a): First-year implementation of Ingenium's five-year 2020-2025 Strategic Plan (three goals: Collaborate to Innovate; Access for All; Strengthen our Foundations) coincides directly with COVID-19 onset — "the greatest challenge Ingenium has ever faced," per Chair Neil Russon and Director/CEO Christina Tessier's joint message. Museum and site closures, suspended travelling exhibitions, and a pivot to virtual programming (Curating Under Quarantine crowd-sourcing project; participation in the Connected North distance-learning program reaching 40+ remote schools, "many located in Indigenous communities"). Construction/consolidation of the new Ingenium Centre continues through the pandemic; the facility receives Gold-Level Accessibility Certification from the Rick Hansen Foundation. First two Indigenous Sky Symposium sessions held (September equinox, December solstice), reaching 680 participants. A new Sustainability and Outreach Committee is established at the Board level, August 2020.
Undated background, established in bp-2025 (af0205ee75ce): The Canada Science and Technology Museum "reopened in 2017 to a surge of popularity and very positive reviews" — the only direct textual confirmation, in the documents read this review, of the widely known multi-year closure and renewal that preceded the corporation's current 11-permanent-exhibition CSTM configuration; the cause and exact closure dates are not stated in the passage read and are not otherwise sourced in this brief.
2024-25 → 2026-2031 (ar-2025, f282fa612d43, sampled; bp-2031, 2ec815d9d4f8): Governance continuity confirmed directly: Christina Tessier remains Director and CEO and Neil Russon remains Board Chair through ar-2025, i.e., no leadership change across the 2021-2025 window read — a contrast with this batch's ship-rail brief, where the equivalent office saw three leadership transitions in the same years. The Sustainability and Outreach Committee, active through 2024-25, "did not meet in 2025-26 and was dissolved by the Board of Trustees in September 2025" (per the CAFM sibling brief's fuller read of this same ar-2025 document; not independently re-verified in this org's own copy this review — see Residuals). The 2025-2030 Strategic Plan (launched April 1, 2025) renames all three prior strategic goals while the corporate plan itself frames the new plan as "an evolution of" the 2020-2025 plan, not a break from it. CSTM-specific findings from bp-2031's own tables (read directly under this org's document id): attendance 367,000 (2019-20 actual) → 279,000 (2022-23) → 270,782 (2023-24) → 331,504 (2024-25 actual, a real rebound) → budgeted flat at 325,000 for both 2025-26 and 2026-27 — landing just under, not at, the pre-pandemic 2019-20 level. CSTM's own capital allocation in the same plan is comparatively thin: $370K (2024-25) then $0 for three straight years (2025-26 through 2027-28) before resuming at $200K/year from 2028-29, versus CASM's $719K rising to a sustained $2.5M/year by 2027-28 and CAFM's one-time $2.0M in 2026-27 — CSTM, this brief's subject org and the corporation's only "comprehensive science and technology museum," receives the smallest and most back-loaded capital commitment of the three sites in this plan.
Priorities added, dropped, renamed
- Renamed — all three corporate strategic goals, per the CAFM sibling brief's direct citation of this same ar-2025/bp-2031 document pair: "Collaborate to Innovate" → "Connect Society with Science, Technology, and Innovation"; "Access for All" → "Cultivate a Sense of Belonging"; "Strengthen our Foundations" → "Strengthen Ingenium's Foundations," with the corporate plan itself describing the new plan as evolutionary rather than a break. (Not independently re-verified against this org's own copy of the source pages this review — flagged in Residuals.)
- Added — Sustainability and Outreach Committee: established August 2020 (confirmed directly in this org's ar-2021, 9a64032c1a0a); dissolved September 2025 per the sibling brief's read of the same ar-2025 document, with no stated reason in either document.
- Added — explicit Comprehensive Expenditure Review (CER) exemption framing: not present in ar-2021; the 2026-2031 corporate plan states Ingenium "was not subject to reductions from the Comprehensive Expenditure Review" while still "exercis[ing] fiscal restraint... in line with Government of Canada objectives" (bp-2031, 2ec815d9d4f8, read directly under this org's document id).
- Quietly changed — CSTM's relative standing in the capital plan: not a stated policy but an arithmetic pattern visible directly in bp-2031's own capital table — CSTM receives the smallest, most back-loaded allocation of the corporation's three sites for 2024-2031, despite being the corporation's flagship "comprehensive science and technology museum" and the site with the largest absolute attendance.
- No priority is stated as dropped outright in the documents read; the 2020-2025 Strategic Plan's core themes (access, sustainability of operations, public engagement) persist in renamed form into 2025-2030.
Budget & mandate inflection points
- 2016-2020 — Ingenium Centre constructed: base building construction, interior fit-up, professional services, and contingency together total $150.586 million across FY2016-17 through FY2019-20 (per bp-2025's own Table 10 capital-cost breakdown, af0205ee75ce) — read directly, not inferred from the CAFM sibling brief.
- August 2020 — Sustainability and Outreach Committee established at Board level (ar-2021, 9a64032c1a0a).
- 2020-2021, fiscal-year start — COVID-19 onset coincides with first-year implementation of the 2020-2025 Strategic Plan (ar-2021).
- April 1, 2025 — 2025-2030 Strategic Plan launches, renaming all three prior strategic goals (per sibling brief's read of the source; corporate plan frames it as evolutionary).
- September 2025 — Sustainability and Outreach Committee dissolved by the Board, no stated reason (per sibling brief's read of ar-2025).
- 2027-28 — Corporation-wide unrestricted net assets projected to turn negative (-$7.2 million) for the first time in the read record, per bp-2031's own financial tables (2ec815d9d4f8), continuing to -$51.0 million by 2030-31 as temporary federal top-up funding is assumed to expire after 2026-27.
- 2026-27 — CSTM's own site-specific capital allocation in the same plan drops to $0 (a three-year stretch, 2025-26 through 2027-28), while CASM's rises to $2.775 million that year and CAFM receives a one-time $2.0 million — read directly from bp-2031's Table under this org's document id.
Ontario/Toronto relevance
Indirect and geographically distant. Ingenium and all three of its museum sites, including CSTM, are located in Ottawa, Ontario, not Toronto; no document read this review names any Toronto-specific program, partnership, exhibition tour stop, or presence. CSTM is described in bp-2025 as "Canada's only comprehensive science and technology museum," a national (not regional) claim of significance, but its physical footprint and governance are entirely Ottawa-based. Ontario relevance is limited to the province-wide fact of the corporation's location and Ontario board-member representation (not independently re-verified this review; see the CAFM sibling brief for direct citation of specific Trustees' regional listings from the same document set). This brief's relevance assessment for the parent corporation is therefore the same as its sibling site's: an Ontario institution, not a Toronto/GTA one.
Residuals & gaps
- 21 of 33 registry rows entirely unavailable (2000-2020, all annual reports) — registry marks all as
archived, but no matching WARC capture exists in this extraction (no-manifest-match), and all 21 carry the⚠️ Still being checked: capture-artifact-goc-interstitialflag. This is the largest gap, proportionally and in absolute years, among this lane's four orgs: the corporation's 1990 founding, its first three decades of operation, and — critically — the CSTM's multi-year closure and 2017 reopening (confirmed only in passing, via a single retrospective sentence in bp-2025) are entirely undocumented in this archived set. A future pass targeting pre-2021 captures specifically for this org would materially improve the brief. - Three annual reports (ar-2022, ar-2023, ar-2024) keyword-screened but not opened — scanned for pandemic/closure/reopening/renewal/Ingenium/deficit/surplus/Comprehensive-Expenditure-Review terms; nothing in the scans contradicted the narrative above, but no direct quotes or figures from these three years are cited in this brief. This leaves the corporation's own account of its 2022-2024 recovery trajectory (attendance, finances, strategic-plan-cycle progress) undocumented here beyond the bp-2031 table figures.
- Five corporate plans (bp-2026 through bp-2030) not opened at all — these would show the year-by-year evolution of the deficit projection and capital plan now only visible as a single before/after snapshot (bp-2025 vs. bp-2031); not analyzed this review.
- ar-2025 read only in targeted fashion this review (governance/leadership-continuity passages, directly from this org's own copy); several specific claims above (strategic-goal renaming, Sustainability and Outreach Committee dissolution) are sourced to the CAFM sibling brief's fuller, independent read of the identical underlying document rather than to a fresh line-by-line read performed in this review — flagged explicitly as such above, per the shared-document honesty this format requires. A future pass should independently verify these passages directly against this org's own
ar-2025copy. - No stub-suspected or extract-failed rows in this org's
_index.json— the only gap category present isno-manifest-match(pre-2021). No detector disagreement to report in either direction. - ⚠️ Still being checked: the reason for the Sustainability and Outreach Committee's September 2025 dissolution — neither document available to this org names one (same open question the CAFM sibling brief raised).
- ⚠️ Still being checked: whether CSTM's comparatively thin capital allocation in the 2026-2031 plan reflects a deliberate site-prioritization decision (e.g., CASM or CAFM having more urgent facility needs) or simply sequencing after the Ingenium Centre's completion absorbed CSTM-era capital in the 2016-2020 window; no document read states a reason.