Exhibition Place
governed by Exhibition Place Board of Governors; Vision Plan is long-term (no defined end year); FOI via central portal
Current this library's internal records: Exhibition Place Vision Plan (2026)
Completeness
- Document shelf: 12 rows (11 archived · 1 staged · 0 pending · 0 missing)
- Backgrounder: on file
- Strategy-evolution brief: on file
- Custody audit: 11 of 12 row(s) audited, 6 flagged
- Last verified: 2026-08-06 · this org has NOT had a full discovery-verification pass (our discovery-verification log)
Endpoints
- Website
- Open data: not yet verified
- API: not yet verified
- RSS: not yet verified
- Newsroom: not yet verified
- FOI / access requests: not yet verified
Document shelf (12 rows)
| Year | Type | Title | Archive status | Flags |
|---|---|---|---|---|
| 2026 | Other | Fulfilling Ex Place's Destiny - 192 Acres of Possibilities Vision Plan | archived | |
| 2026 | Strategic plan | Exhibition Place Strategic Plan 2022-2026 | archived | |
| 2024 | Other | Exhibition Place Transportation Network and Event Logistics Study (Phase 3) | archived | |
| 2024 | Other | Exhibition Place Economic Impact Study | archived | |
| 2022 | Strategic plan | Exhibition Place Strategic Plan 2022-2026 | archived | ⚠️ Still being checked: plan-horizon-2026 |
| 2019 | Strategic plan | Exhibition Place Strategic Plan 2017-2019 | archived | |
| 2017 | Strategic plan | Exhibition Place Strategic Plan 2017-2019 | archived | ⚠️ Still being checked: plan-horizon-2019 |
| 2016 | Financial statements | Exhibition Place 2016 Audit Results and Financial Statements | staged | ⚠️ still being checked — the fetch failed on 2026-07-30; ⚠️ still being checked — the fetch failed on 2026-07-31; ⚠️ still being checked — the fetch failed on 2026-08-01; ⚠️ still being checked — the fetch failed on 2026-08-02; ⚠️ still being checked — the fetch failed on 2026-08-04; ⚠️ still being checked — the fetch failed on 2026-08-05; ⚠️ still being checked — the fetch failed on 2026-08-06 |
| 2016 | Strategic plan | Exhibition Place Strategic Plan 2014-2016 | archived | |
| 2015 | Financial statements | Exhibition Place 2015 Consolidated Financial Statements | archived | |
| 2014 | Strategic plan | Exhibition Place Strategic Plan 2014-2016 | archived | ⚠️ Still being checked: plan-horizon-2016 |
| 2012 | Strategic plan | Exhibition Place Strategic Plan 2009-2012 | archived |
Backgrounder
Source: this library's internal records — a mechanical research draft, not independently reviewed for publication; reproduced as-is.
Exhibition Place - backgrounder
Backgrounder / 2026-07-30 / registry row: tor-exhibition-place (this library's government-document registry) / lens file for this org's series briefs
Mandate & statutory basis
The Board of Governors of Exhibition Place "was originally established in 1983 under the Municipality of Metropolitan Toronto Act and is continued as a board of the City of Toronto under subsection 407(1) of the City of Toronto Act, 2006" (S.O. 2006, c. 11, Sched. A; https://www.ontario.ca/laws/statute/06c11, verified — title/table of contents confirmed) (https://www.explace.on.ca/about/board-of-governors/members-structure/, fetched). "The Board is a body Corporate and an agent of the City" (same source).
Roles, responsibilities & scope
Exhibition Place operates 192 acres of convention, exhibition and event venues on Toronto's waterfront, including the Enercare Centre, Automotive Building, Better Living Centre and StudioEx (registry id: tor-exhibition-place, registry row; https://www.explace.on.ca, fetched). Per the City of Toronto Act, 2006, the grounds may be used for "Parks and Exhibition purposes"; trade centres and fairs "such as, but not limited to, the annual Canadian National Exhibition and the Royal Agricultural Winter Fair"; displays, agricultural activities, sporting events and public entertainment; highway, electrical transmission or public utility purposes; and any other purpose City Council approves (https://www.explace.on.ca/about/board-of-governors/members-structure/, fetched, quoting the Act).
Governance & reporting line
The Board comprises nine members appointed by City Council: the Mayor or designate, four Members of Council, and four public members recruited under the City's Public Appointments Policy (https://www.explace.on.ca/about/board-of-governors/members-structure/, fetched). The Board meets 6–8 times per calendar year to review operations and to approve or recommend Council approval of business and contractual matters (same source).
Budget scale
⚠️ not yet confirmed against an original source. A 2015 covering memo to the Board records a "2015 consolidated net profit on a cash basis which will be transferred to the City" of $495,931 against a budgeted net income of $252,308 (Exhibition Place 2015 Consolidated Financial Statements, document id: tor-exhibition-place-fs-2015), but this is a single-year net-profit figure, not a total-revenue or total-budget order-of-magnitude, and it is a decade old. A separate 2024 Economic Impact Study found Exhibition Place-hosted events generated $594.5M in regional economic impact and $80.6M in government tax revenue in 2023 (document id: tor-exhibition-place-oth-2024-2), but that measures visitor/event spillover, not Exhibition Place's own operating budget, so it is not used as the budget-scale figure here.
Institutional history
The Board of Governors of Exhibition Place was established in 1983 under the Municipality of Metropolitan Toronto Act and continued as a City of Toronto board under s.407(1) of the City of Toronto Act, 2006 following the 1998 municipal amalgamation (https://www.explace.on.ca/about/board-of-governors/members-structure/, fetched); the exhibition grounds themselves predate 1983 by over a century per the site's own "over a century" framing, but that earlier history is ⚠️ still being checked.
Strategy evolution brief
Source: this library's internal records — a mechanical research draft, not independently reviewed for publication; reproduced as-is.
Exhibition Place - strategy evolution
2026-08-02 / registry: tor-exhibition-place / grounded in archived copies (cited document id + sha256) / read through our research file for that body
TL;DR: Across four strategic-plan generations (2009-2012 through 2022-2026), the biggest priority addition is "site animation 365-days-a-year" — turning idle non-event time into programmed public/community use — which first appears explicitly as a named goal in 2022-2026 and is now the organizing idea behind the 2026 "192 Acres of Possibilities" vision plan's push for a permanent, non-ticketed "gathering place." The biggest quietly dropped element is the standalone "Safety and Security" strategic goal, present as one of seven core goals in every plan from 2009 through 2017-2019 but folded without explanation into "Exceed Client and Visitor Expectations" by 2022-2026. The most load-bearing number the record supports is the 2023 economic-impact finding of $594.5M in regional impact and $80.6M in government tax revenue (up from a $400-420M impact figure cited as recently as 2017-2019), though this measures visitor/event spillover, not Exhibition Place's own operating budget, which the archived series never establishes at any order of magnitude. One open question the record cannot resolve: whether or how the Ontario Line transit hub and Ontario Place redevelopment — cited as transformative in every plan since 2014 but never completed within the archived window — will actually reshape the site, since the 2026 vision plan is still framed as aspirational ("the moment is here to define what Exhibition Place becomes next").
Backgrounder summary
Exhibition Place is a board of the City of Toronto, established in 1983 under the Municipality of Metropolitan Toronto Act and continued under s.407(1) of the City of Toronto Act, 2006, as "a body Corporate and an agent of the City." It operates 192 acres of convention, exhibition, and event venues on Toronto's waterfront — including the Enercare Centre, Automotive Building, Better Living Centre, and StudioEx — for parks/exhibition purposes, trade fairs (notably the CNE and Royal Agricultural Winter Fair), sporting/entertainment events, and other Council-approved uses. The nine-member Board (Mayor or designate, four Councillors, four public members) meets 6-8 times yearly. Budget scale is not established at an operating-budget order of magnitude in the backgrounder; the closest figures are a 2015 net-profit-on-cash-basis transfer to the City of $495,931 and the 2024 Economic Impact Study's $594.5M regional economic impact / $80.6M government tax revenue figure, which the backgrounder explicitly does not treat as a budget-scale proxy.
Series inventory
_index.json: 11 ok / 0 stub-suspected / 0 extract-failed.
| document id | year | type | archive ref sha256-12 | content read? |
|---|---|---|---|---|
| tor-exhibition-place-sp-2012 | 2012 | strategic-plan | 6ea45d860b57 | yes |
| tor-exhibition-place-sp-2014 | 2014 | strategic-plan | 1728e460bf71 | yes |
| tor-exhibition-place-sp-2016 | 2016 | strategic-plan | 1728e460bf71 | yes — duplicate of sp-2014 (identical sha256, same underlying "2014-2016 Strategic Plan" PDF; registry lists it under year 2016) |
| tor-exhibition-place-sp-2017 | 2017 | strategic-plan | 471eb8770364 | yes |
| tor-exhibition-place-sp-2019 | 2019 | strategic-plan | 471eb8770364 | yes — duplicate of sp-2017 (identical sha256, same "2017-2019 Strategic Plan" PDF; registry lists it under year 2019) |
| tor-exhibition-place-sp-2022 | 2022 | strategic-plan | 859b0f38899b | yes |
| tor-exhibition-place-sp-2026 | 2026 | strategic-plan | 859b0f38899b | yes — duplicate of sp-2022 (identical sha256, same "2022-2026 Strategic Plan" PDF; registry lists it under year 2026, i.e. this is the still-current plan, not a new one) |
| tor-exhibition-place-fs-2015 | 2015 | financials | 0e75938ab8a0 | yes |
| tor-exhibition-place-oth-2024 | 2024 | other | 1b065834ccf0 | yes |
| tor-exhibition-place-oth-2024-2 | 2024 | other | 0d2cf7391421 | yes |
| tor-exhibition-place-oth-2026 | 2026 | other | 237f6b1388bd | yes |
Detector disagreement: none — the stub detector correctly marked all 11 as ok, and reading confirmed all 11 carry real, substantive document content. The true count of distinct source documents, however, is 8, not 11: three document id pairs (sp-2014/sp-2016, sp-2017/sp-2019, sp-2022/sp-2026) share identical sha256_12 values and are the same archived PDF filed under two registry years. This is a registry-modeling artifact (the org's plans span multiple years and got a row per covered year), not an extraction failure — flagged here per the spec's live-QA instruction since it affects how "N documents" should be read for this org.
Priority evolution
2009-2012 (sp-2012, 6ea45d860b57): First archived strategic plan. Seven Strategic Goals: Business Development, Infrastructure, Environmental, Safety and Security, Recognition/Public Understanding, Organizational and Staffing, Financial. Framing is "Always Moving Forward While Building on the Past" — heritage-conscious, revenue-focused (~$75M revenues cited for FY2008, ~180 employees, 13-member Board). Core assets already established: Direct Energy Centre (renamed from National Trade Centre), Allstream Centre (opened 2009), Ricoh Coliseum, BMO Field (2007). No mention of transit, Indigenous engagement, or climate/sustainability beyond a general "environmental stewardship" goal.
2014-2016 (sp-2014/sp-2016, 1728e460bf71): Same seven-goal skeleton retained (goal #2 renamed "Infrastructure" → "Public Space and Infrastructure"), but the plan adds a new front-loaded "Transformational Opportunities" section — the first appearance of forward-looking, externally-driven priorities distinct from the recurring operational goals: hosting the 2015 Pan/Parapan American Games, the Hotel X development (breaking ground 2013), the closure and uncertain future of neighbouring Ontario Place (closed 2012), surrounding-community growth (Liberty Village, Fort York), and a case for expanded exhibition/convention space. Board shrinks from thirteen to nine members (reflecting the City of Toronto Act, 2006 structure). Financial self-sufficiency reframed with a concrete track record: ~$11M in surpluses over 2009-2012.
2017-2019 (sp-2017/sp-2019, 471eb8770364): Vision reframed under a new organizing theme, "Gathering Place" — the first time the plan leads with a single unifying identity concept rather than a goal list alone. Seven goals retained but relabeled as "Focus Areas" (Finance replaces "Financial" as a shorter label). New: an explicit "Strategic Planning Evolution and Context" table comparing 2009-2013 / 2014-2016 / 2017-2019 side by side on theme, major initiatives, neighbourhood population/employment growth, and financial performance — the only instance in the series of the org explicitly historicizing its own prior plans. New process element: formal SWOT analysis and ~50-stakeholder consultation including a town hall with adjacent neighbourhoods. New priority language: "labour strategy" (competitiveness of Exhibition Place's cost structure vs. other Toronto/North American venues) and "communicate better" (public confusion about the org's role) appear as named stakeholder-sourced themes for the first time. Financial performance trend disclosed as declining: average annual surplus fell from $2.53M (2009-2013 baseline) to $0.45M (2014-2016).
2022-2026 (sp-2022/sp-2026, 859b0f38899b): Most significant structural break in the series. Seven goals collapse/reorganize into six "Strategic Goals": Exceed Client and Visitor Expectations, Promote Site Animation 365-days a Year, Solidify Position as a Leading Convention and Event Space, Enhance Brand Identity and Promotion, Invest in our People and Culture, Ensure Competitively Priced Services and Sustainable Operations. Standalone "Safety and Security" and "Environmental" goals as named headings disappear (safety folded into Goal 1; environmental/sustainability folded into Goal 6 and cross-cutting language). Vision is upgraded from a "Gathering Place" identity to an explicit competitive/aspirational claim: "Canada's Premier Destination for Conventions, Exhibitions, Events, and Entertainment." New, first-time-named priorities: Diversity, Equity and Inclusion (DEI) as an explicit workforce priority; COVID-19 pandemic recovery as a stated planning driver; a "Master Plan" (City of Toronto-led, with Relax/Entertain/Exhibit zone concept) as an explicit external input shaping the Strategic Plan for the first time; the Ontario Line transit project (first named here) as a future infrastructure driver. Values list is fully replaced (Respect/Ownership/Collaboration/Continuous Improvement/Stewardship → Collaboration/Inclusivity/Innovation/Accountability/Integrity). Economic impact figure reported at $500M+ (up from $400-420M in 2017-2019).
2023-2024 transportation planning (oth-2024, 1b065834ccf0): A WSP-authored technical consulting study (Phase 3 of a three-phase Transportation Network and Event Logistics / pedestrianization project), not itself a strategic plan, but directly operationalizing the 2022-2026 Strategic Plan's "Exceed Client and Visitor Expectations" and site-animation goals into physical corridor design. Introduces detailed vehicle/pedestrian scenario planning (No Events / Major Events / Event Setup-Takedown) across four defined site corridors, cites Exhibition Place's status as a City "Transportation Innovation Zone" enabling emerging-tech pilots (smart parking piloted at TFC/Argonauts games via Green P app), and catalogs the Ontario Line (targeted operational by 2031), Waterfront LRT extension, and Ontario Place Mobility Hub as the external transit drivers the site must design around. Confirms parking remains structurally unresolved: a 2016 Parking Study found no business case for a parking structure, yet some events (Royal Winter Fair) use up to 90% of site parking capacity.
2024 Economic Impact Study (oth-2024-2, 0d2cf7391421): Reports the $594.5M 2023 economic-impact figure (3,726 jobs supported, $80.6M government tax revenue, $174.66M visitor spending) using a new methodology (Destination International's Event Impact Calculator, applied by HLT Advisory) explicitly adopted to fulfill the 2022-2026 Strategic Plan's "evidence-based methodology" commitment under Goals 3 and 4. Notes the org's economic-impact measurement lineage goes back to a 1999 Chicago-consultant study and a 2006 University of Guelph study — this 2024 study is described as broadening scope beyond prior anchor-event-only measurement to include all tenants and ancillary business activity.
2026 vision plan (oth-2026, 237f6b1388bd): A short (6,514-char) City of Toronto legislative-backgroundfile document, "192 Acres of Possibilities: Fulfilling Ex Place's Destiny," dated April 2026 — not a Board-issued strategic plan but a City-facing vision/pitch document. It crystallizes "365-days-a-year" animation (first named 2022) into a fuller redevelopment thesis: transforming Exhibition Place from "a collection of event venues into an interconnected civic destination" via an "intensification and interconnection" concept, citing the Ontario Line transit hub, Ontario Place redevelopment, Western Waterfront evolution, the Bentway-Strachan Gate connection, and a "Hotel Phase 2" as the convergent drivers making this "a once-in-a-generation opportunity." Frames a target of hosting 100,000+ people on a single site for large-scale events. This is the most forward-leaning document in the series but is explicitly aspirational/conceptual rather than an adopted operating plan — no budget, timeline, or approval status is stated in the extracted text.
Priorities added, dropped, renamed
- Added — "Transformational Opportunities" as a distinct planning category: absent from sp-2012 (6ea45d860b57); first appears sp-2014 (1728e460bf71) naming the Pan Am Games, Hotel X, and Ontario Place; the category itself (though not those specific items) persists conceptually into later plans as externally-driven infrastructure narratives.
- Added — "Gathering Place" as organizing identity: first appears sp-2017 (471eb8770364); still present as legacy framing ("builds on our legacy as a 'gathering place'") in sp-2022 (859b0f38899b) even as the headline vision changes to "Canada's Premier Destination."
- Added — Diversity, Equity, and Inclusion (DEI) as a named workforce priority: absent from sp-2012 through sp-2017 (6ea45d860b57, 1728e460bf71, 471eb8770364); first appears sp-2022 (859b0f38899b), both in the Chair/CEO message and as an explicit Goal 5 objective.
- Added — "Site Animation 365-days a Year" as a standalone strategic goal: absent from all plans through sp-2017 (471eb8770364, where "under-utilization of spaces... lack of activity on the site 365 days" appears only as a listed Weakness, not a goal); becomes Strategic Goal 2 in sp-2022 (859b0f38899b) and is the central thesis of oth-2026 (237f6b1388bd).
- Added — City-led "Master Plan" as a named external planning input: not present as a named document in sp-2012/sp-2014/sp-2017; first cited by name in sp-2022 (859b0f38899b, "Next Place Plan") and central to oth-2024's cited planning-document review (1b065834ccf0).
- Added — Ontario Line transit project: not named in sp-2012/sp-2014/sp-2017; first appears sp-2022 (859b0f38899b) as a future driver; becomes a load-bearing justification in oth-2024 (1b065834ccf0) and oth-2026 (237f6b1388bd).
- Quietly dropped — standalone "Safety and Security" strategic goal: present as one of seven core goals in sp-2012, sp-2014, and sp-2017 (6ea45d860b57, 1728e460bf71, 471eb8770364); no longer a standalone named goal in sp-2022 (859b0f38899b) — safety language is folded into Goal 1 ("Exceed Client and Visitor Expectations": "ensure visitors have a safe and sustainable experience"). No report states a reason for the reorganization.
- Quietly dropped — standalone "Environmental" strategic goal: present as a standalone goal in sp-2012, sp-2014, and sp-2017 (6ea45d860b57, 1728e460bf71, 471eb8770364, with concrete targets like zero-waste and net-zero grid electricity by 2019); no standalone environmental goal heading in sp-2022 (859b0f38899b) — sustainability language persists but distributed across Goal 6 and general framing rather than as its own goal with its own objectives.
- Renamed — "Financial" → "Finance" (sp-2017) → "Ensure Competitively Priced Services and Sustainable Operations" (sp-2022): same underlying concern (positive operating performance, cost control) reframed with an explicit competitiveness/pricing lens by sp-2022 that earlier plans did not state (6ea45d860b57 → 471eb8770364 → 859b0f38899b).
- Renamed — "Recognition/Public Understanding" (sp-2012/sp-2014) → "Enhance Brand Identity and Promotion" (sp-2022): shift from a public-understanding/awareness framing to an explicit brand-strategy framing, with a new emphasis on distinguishing the "Exhibition Place" brand from its tenants/events' brands (859b0f38899b).
Budget & mandate inflection points
- 2012 — Board Chair transition and continuity: Councillor Mark Grimes chairs the Board across sp-2012, sp-2014, and sp-2017 (6ea45d860b57; 1728e460bf71; 471eb8770364) — an unusually long single-chair tenure spanning three plan cycles.
- 2015 — 2015 Pan/Parapan American Games hosted; cited prospectively in sp-2014 (1728e460bf71) as a "Transformational Opportunity" and retrospectively in sp-2017's comparison table (471eb8770364) as a completed major initiative.
- Oct 19, 2009 / ongoing — Allstream Centre operations, financed via a $35.6M City of Toronto loan ($38.675M with accrued construction interest); by 2015 the Centre carried a net loss of ($2,496,687) on the financial statements, driven by non-cash interest/amortization charges of ($1,720,555) and ($1,931,964) respectively (fs-2015, 0e75938ab8a0).
- Dec 2007 / Nov 5, 2012 / Sept 9, 2013 — City Council decision history establishing and then expanding the Exhibition Place Conference Centre Reserve Fund (CCRF), including its 2013 use to fund contaminated-soil disposal tied to the Princes Gates Hotel lease (fs-2015, 0e75938ab8a0).
- 2016 — Chair transitions to Councillor Mark Grimes still in Vice-Chair/Chair role per sp-2017's Board list, but the Board composition changes (Justin Di Ciano as Vice Chair, Kristen Carmichael Greb added) (471eb8770364).
- 2022 — Board Chair remains Councillor Mark Grimes; CEO transitions from Dianne Young (named CEO in sp-2012/sp-2014/sp-2017) to Don Boyle (named CEO in sp-2022 and both 2024 documents) — the exact transition date is ⚠️ still being checked, not stated in the archived series.
- 2022 — COVID-19 pandemic explicitly named as a strategic-planning driver for the first time (sp-2022, 859b0f38899b): "Exhibition Place has been challenged by the recent COVID-19 pandemic... requiring us to reestablish our services to visitors, clients, and tenants."
- 2023 — Economic impact methodology changed from prior anchor-event-only measurement to the Destination International Event Impact Calculator (EIC) applied across all tenants/ancillary business, yielding the $594.5M / $80.6M tax-revenue figures (oth-2024-2, 0d2cf7391421).
- Jan 18, 2024 — WSP's Transportation Network and Event Logistics Phase 3 memo delivered in draft, formalizing a four-corridor pedestrianization plan tied to the future Ontario Line and Ontario Place redevelopment (oth-2024, 1b065834ccf0).
- April 2026 — "192 Acres of Possibilities" vision plan tabled as a City legislative backgroundfile, framing a "once-in-a-generation opportunity" convergence of the Ontario Line, Ontario Place redevelopment, Bentway-Strachan Gate connection, and Hotel Phase 2 (oth-2026, 237f6b1388bd) — outcome/approval status not established in the archived text.
Ontario/Toronto relevance
Direct and total: Exhibition Place is a City of Toronto board/agency under s.407(1) of the City of Toronto Act, 2006, operating City-owned lands on Toronto's waterfront, governed by a Board that includes the Mayor or designate and four City Councillors, with its Chief Financial Officer/Corporate Secretary role and Board Solicitor drawn from City of Toronto Legal Services in every plan reviewed (6ea45d860b57; 1728e460bf71; 471eb8770364; 859b0f38899b). Every document in this series is either a Board-issued plan or a City of Toronto legislative backgroundfile (oth-2024, oth-2024-2, oth-2026 all carry toronto.ca/legdocs URLs). The 2024 Economic Impact Study report is addressed to the Board and explicitly ties to Ward 10 - Spadina-Fort York (oth-2024-2, 0d2cf7391421). Every strategic plan in the series frames the site's core value proposition in terms of City of Toronto economic impact, waterfront revitalization, and integration with adjacent Toronto neighbourhoods (Liberty Village, Fort York, Parkdale, City Place). This is the paradigm case of a directly Toronto-relevant municipal agency, not an indirect one.
Residuals & gaps
- True distinct-document count is 8, not 11: the registry's 11-row
_index.jsoncontains three duplicate-content pairs (sp-2014/sp-2016, sp-2017/sp-2019, sp-2022/sp-2026), each pair sharing an identical sha256_12 — same archived PDF filed under two adjacent registry years reflecting each plan's multi-year coverage window. The stub detector correctly read all 11 asok(no disagreement with the detector), but a reader relying on the doc count alone would overstate the series' breadth; this brief cites the underlying 8 unique documents. - No annual/interim strategic-planning updates archived between plan generations: the series jumps sp-2012 → sp-2014 → sp-2017 → sp-2022, each plan itself covering roughly 3-4 years, meaning the archived record captures four plan-adoption snapshots (2009-2012, 2014-2016, 2017-2019, 2022-2026) with no visibility into interim annual reports, board minutes, or budget documents that might show priority drift within a plan cycle.
- No financial statements later than 2015 are archived: fs-2015 (0e75938ab8a0) is the only financials document in this set; the 2024 Economic Impact Study measures visitor/event spillover, not Exhibition Place's own operating revenue or budget, so the org's current budget scale remains ⚠️ still being checked, consistent with the backgrounder's own flag.
- ⚠️ Still being checked: exact date of the CEO transition from Dianne Young to Don Boyle (bracketed only by sp-2017, 471eb8770364, naming Young, and sp-2022, 859b0f38899b, naming Boyle — no report in this set names the transition date).
- ⚠️ Still being checked: approval/adoption status of the April 2026 "192 Acres of Possibilities" vision plan (oth-2026, 237f6b1388bd) — the extracted text is a short pitch-deck-style document with no stated Board resolution, budget, or City Council decision reference.
- ⚠️ Still being checked: whether a strategic plan covering 2027 onward exists or is in development; the archived series' most recent Board-adopted plan (sp-2022/sp-2026, 859b0f38899b) runs only through 2026.
- No archive_status=missing years and no era:pre-web-baseline flags apply to this series per the registry; all extraction gaps identified here are duplicate-filing artifacts, not extraction failures.